Electrifying last mile fleets is a huge task that traditional all-in-one DC chargers and even newer distributed systems are not designed for.
Tritium and our partner have rethought overnight fleet charging to provide a highly cost optimized, lower CAPEX solution based on each charger drawing from a shared DC pool.
Cabling costs go way down while efficiency and reliability go up. What's not to like?